Seasonal Pool Closing with an Ice Equalizer Pillow

Close the pool in a controlled order, beginning with cleaning and equipment preparation and ending with pillow placement, cover fastening, a 24-hour inspection, and scheduled winter checks.

The ice equalizer pillow is installed near the end of the closing processβ€”not at the beginning. The water, plumbing, equipment, fittings, and winter level should already be prepared before the pillow goes onto the pool. Following a defined order reduces the need to reopen the cover because a drain plug, hose, skimmer, water level, or piece of hardware was missed.

  • Begin planning about 7 days before closing
  • Complete the first inspection after 24 hours
  • Inflate the pillow to about 70%
  • Made with 0.5 mm cold-resistant PVC
  • Material range: βˆ’25Β°C to 80Β°C
  • Available in 6 flat sizes
  • Flat sizes range from 3 Γ— 3 ft to 4 Γ— 15 ft
  • Mini Boston-style valve
  • Reinforced grommets and securing rope included
  • Pump or blower not included

What an Ice Equalizer Pillow Does

An ice equalizer pillow is a flexible air chamber placed beneath an above-ground winter cover. It supports one part of the closing setup but does not perform the water-treatment, plumbing, equipment, drainage, or cover-fastening work.

Creates Central Cover Lift

A partly inflated pillow raises a section beneath the middle of the flexible cover. The raised area may reduce one deep central basin where rainwater, melting snow, wet leaves, and debris would otherwise collect.

Leaves Flexible Air Space

At about 70% inflation, the chamber remains slightly soft instead of becoming a rigid dome. The remaining space allows the pillow to respond more gradually as air temperature and cover pressure change.

Completes the Final Setup

The pillow is placed after pool cleaning, water preparation, equipment care, plumbing work, and water-level adjustment. Installing it too early can interfere with tasks that still require open access to the pool.

Plan the Work Across Several Days

Spreading the work across several days gives enough time to inspect the pool, correct missing parts, allow the water treatment to circulate, and choose a dry period for pillow and cover installation.

TimingMain WorkPillow Status
7 Days BeforeInspect pool, cover, equipment, plugs, rope, and fittingsClean, dry, and uninflated
3–5 Days BeforeClean the pool and prepare required water treatmentStored away from the work area
1–2 Days BeforePrepare plumbing, pump, filter, heater, and hosesInspect PVC, seams, valve, and grommets
Closing DayConfirm water level and finish equipment workInflate to about 70% and position
First 24 HoursAllow cover, ropes, and water surface to settleRecheck position and firmness
Closed SeasonInspect after major weather changesMonitor shape, drift, and air level
Spring OpeningRemove surface water and debris firstClean, dry, deflate, and store

Allow Time for Missing Parts

A worn plug, damaged cover clip, leaking hose, missing rope, or incompatible pump fitting can delay the entire closing process. Early inspection leaves time to replace these parts before freezing weather arrives.

Choose a Suitable Weather Window

A dry, calm day makes large pillows and covers easier to handle. Strong wind may rotate the pillow, pull the cover out of position, or introduce leaves and debris while the pool remains open.

Keep the Final Day Focused

Closing day should concentrate on final water-level confirmation, pillow inflation, positioning, and cover installation. Tasks involving plumbing or equipment should already be finished whenever possible.

Gather Everything Before Closing Day

Prepare the required equipment in one accessible area. A missing tool or attachment can leave the pool uncovered while weather, wind, or falling debris changes the conditions.

Prepare Pool Equipment

Collect the parts required for the installed pool system.

  • Winter plugs and fitting covers
  • Skimmer protection parts
  • Pump and filter drain components
  • Hose caps or storage fittings
  • Equipment manuals and instructions

The exact components depend on the pool, plumbing, pump, filter, heater, and winterization method.

Prepare Pillow Equipment

Set aside everything needed for pillow installation.

  • EPN pool pillow in the selected size
  • Included securing rope
  • Compatible low-pressure pump
  • Smooth ground tarp
  • Soft cloth for the valve area

Keeping the pillow equipment separate prevents small parts from becoming mixed with plumbing and filter components.

Prepare Cover Equipment

Confirm that the winter-cover system is complete.

  • Winter cover in usable condition
  • Cable, clips, straps, or anchors
  • Approved cover pump
  • Drainage or discharge hose
  • Soft-edged debris-removal tools

Inspect all fastening and drainage parts before the cover is spread across the pool.

Clean the Pool Before Winter Treatment

Leaves, insects, soil, algae, and loose debris should be removed before the winter cover is installed. Material left inside the pool remains below the water and cannot be reached without opening the cover.

Remove Surface Debris

Use a suitable skimmer net to collect floating leaves, insects, and other material. Clearing the surface first prevents debris from sinking while the walls and floor are being brushed.

Brush and Vacuum

Brush the wall, corners, steps, and floor using equipment approved for the liner. Vacuum settled debris so organic material is not left beneath the cover for several months.

Empty Collection Equipment

Clean skimmer baskets, pump baskets, automatic cleaner bags, and other collection parts. Material left inside wet equipment may produce odor, staining, or blockage during storage.

Prepare the Water Before Equipment Shutdown

Water treatment should be based on current test results, actual pool volume, sanitizer system, liner requirements, and the instructions supplied with the selected winter-treatment products.

Test the Current Water

Measure the water using an appropriate test method before adding treatment. Do not estimate chemical quantities from water appearance alone, because clear water may still require adjustment before long-term covering.

Follow Product Dosages

Use the dosage instructions for the actual pool volume and treatment product. Avoid combining chemicals in one container or using amounts intended for a different sanitizer, liner, or water capacity.

Allow Required Circulation

When the treatment instructions require circulation, complete it before the pump and plumbing are shut down. Give the system enough operating time to distribute the treatment through the water.

Prepare Pumps, Filters, and Heaters

Water left inside pool equipment may freeze and expand. Each pump, filter, heater, chlorinator, and accessory should be prepared according to its own instructions before severe cold begins.

Drain the Pump

Switch off power according to the equipment instructions before opening drain points. Remove water from the pump body and basket area where required, then store drain plugs in a labeled location.

Prepare the Filter

Sand, cartridge, and diatomaceous-earth filters follow different winter procedures. Use the correct method for the installed filter rather than applying one set of steps to every system.

Protect the Heater

Pool heaters may contain internal passages that retain water. Follow the heater instructions for draining, bypassing, disconnecting, or professional service before freezing temperatures arrive.

Remove Water from Exposed Lines

Hoses, skimmer connections, return lines, and above-ground plumbing sections can retain water after the circulation equipment stops. Remaining water may freeze inside fittings or low sections.

Disconnect Removable Hoses

Drain and disconnect flexible hoses when required by the system instructions. Hold each hose so trapped water can leave before it is loosely coiled and stored in a protected location.

Prepare Skimmer Connections

Use the specified skimmer plug, winter plate, insert, or water-level method for the installed pool. Check gaskets and sealing areas before completing the closure.

Protect Return Fittings

Install the correct return plug or closure after the water and plumbing work is complete. Confirm that the plug sits correctly and does not create a sharp contact point near the future pillow position.

Confirm the Final Level Before Adding the Pillow

The winter water level must be set before the pillow and cover are installed. Changing it afterward may require moving or reopening the cover and can alter the available clearance beneath the pillow.

Follow the Pool Instructions

The correct level depends on the pool, liner, skimmer, return fitting, winter plugs, and cover system. Do not use one general waterline measurement for every above-ground pool.

Avoid Excessive Draining

Water helps support the liner and applies outward pressure against the wall. Lowering it farther than required may reduce internal support and increase the distance between the cover and water surface.

Record the Starting Level

Measure from the water surface to a fixed rail or wall reference. A written starting measurement helps identify later water loss caused by leaks, drainage, evaporation, or changing winter conditions.

Complete the Final Open-Pool Inspection

Once the winter cover is secured, access to the pool wall, liner, fittings, and upper water area becomes limited. Complete one final inspection before the pillow is inflated.

Inspect the Pool Structure

Review the main structural areas.

  • Check wall alignment
  • Inspect the top rails
  • Review upright connections
  • Examine the bottom track
  • Look for corrosion or damaged parts

Correct structural concerns before adding cover tension around the pool.

Inspect the Liner and Fittings

Check all accessible water-retaining areas.

  • Look for liner cuts or pulling
  • Inspect the skimmer opening
  • Check return-fitting seals
  • Review winter plugs
  • Note any suspected leak area

Record suspicious locations so they can be checked against the winter water-level measurement.

Inspect the Work Area

Prepare a safe installation route.

  • Remove tools from the deck
  • Clear branches and debris
  • Cover exposed sharp hardware
  • Keep the walking route dry
  • Prepare a clean inflation surface

A clear work area protects both the installers and the 0.5 mm PVC pillow.

Check the Pillow Before Inflation

Unfold the pillow completely on clean grass, a tarp, or another smooth surface. Inspecting it while flat makes it easier to follow the welded edges and view both panels.

Review the PVC Panels

Look across the full upper and lower surfaces for cuts, abrasion, deep creases, residue, or damage caused during shipping or storage. Check corners where folded material may have received more pressure.

Follow the Welded Edges

Trace the full perimeter seam with your hand and eyes. Look for open areas, irregular separation, rough sections, or damage that could affect normal inflation.

Check Valve and Grommets

Open and close the mini Boston-style valve before connecting the pump. Inspect each reinforced metal grommet and confirm that no sharp ring edge or torn PVC surrounds the attachment point.

Confirm the Pillow Size Before Inflation

The selected size affects handling, central coverage, wall clearance, cover slack, inflation time, and storage. All listed dimensions refer to the flat product before air is added.

Pillow SizeFlat AreaClosing-Day Consideration
3 Γ— 3 ft9 sq ftCompact size and easier handling
5 Γ— 5 ft25 sq ftModerate square center coverage
6 Γ— 6 ft36 sq ftBroader rise for larger layouts
8 Γ— 8 ft64 sq ftRequires more handling and cover slack
4 Γ— 8 ft32 sq ftFollows medium elongated layouts
4 Γ— 15 ft60 sq ftLong shape requiring careful alignment

Compare the Water Area

Measure the usable water surface rather than only the outside pool frame. Skimmers, ladders, steps, return fittings, and internal obstacles may reduce available clearance.

Check Cover Slack

The cover needs enough material to settle over and around the inflated chamber. A larger pillow combined with limited cover slack may create a sharp ridge or excessive perimeter tension.

Plan the Carrying Route

Large 8 Γ— 8 ft and 4 Γ— 15 ft pillows may require two people after inflation. Prepare a direct route from the inflation area to the pool without rough concrete or sharp hardware.

Inflate the Chamber to About 70%

The goal is a formed but flexible chamber, not maximum firmness. The pillow should look rounded while yielding slightly when pressed by hand.

Use Low-Pressure Equipment

Connect a compatible low-pressure pump or blower to the valve. High-pressure equipment may add air too quickly and make it difficult to stop at the intended firmness.

Check the Shape Gradually

Pause during inflation and compare the corners, surface, and welded edges. The pillow should rise evenly without appearing stretched, hard, or sharply domed.

Close the Valve Securely

Remove the pump and close the mini Boston-style valve according to its design. Confirm that the cap is aligned and free from sand, leaves, hair, or folded PVC.

Prepare the Position Before Spreading the Cover

The pillow should be reasonably close to the usable center before the winter cover is unfolded. Rope should limit uncontrolled movement without holding the chamber under heavy tension.

Prepare Opposing Lines

Measure and attach rope sections before placing the pillow onto the water. Similar line lengths make it easier to identify which side needs a small adjustment.

Guide Rather Than Pull

Use moderate tension through reinforced grommets. Pulling one rope very tight may hold the pillow near a wall, stretch one attachment area, or rotate a rectangular chamber.

Keep Knots Accessible

Place adjustment knots outside the future cover edge where they can be checked safely. Avoid hiding knots beneath the cover or routing rope over sharp rail components.

Spread the Winter Cover in Stages

The cover may push, rotate, or drag the pillow as it moves across the water. Pause during installation rather than assuming the original position will remain unchanged.

Cover the First Half

Begin from the planned direction and move the cover gradually. Keep hard clips, cable ends, and tools away from the exposed pillow surface during the first stage.

Pause and Recheck

When approximately half of the pool is covered, compare the raised area and rope lengths. Correct obvious rotation or movement before the remaining cover hides the chamber.

Fasten the Perimeter

Align the cover overlap and secure opposing areas in stages. Use the fastening method specified for the winter cover; pillow ropes do not replace cables, clips, straps, or anchors.

Recheck the Complete Setup the Next Day

Water, ropes, pillow air, and cover tension may settle during the first day. Early correction is easier before rain, snow, leaves, or freezing conditions add weight.

Check PointWhat to Look ForNormal Starting Condition
Pillow PositionRaised area remains near the centerBroad, reasonably central rise
Pillow FirmnessNo major loss of shapeSlightly soft at about 70%
Rope TensionNo single line becomes very tightModerate and balanced
Cover OverlapSimilar material around the perimeterNo sharply stretched side
Water LevelClose to the recorded measurementNo unexpected drop
Cover SurfaceNo major water or debris basinLight settling only

Compare the Raised Area

Walk around the pool and observe the cover from several directions. The pillow does not need perfect mathematical alignment, but the high area should not rest close to one wall.

Check Every Fastening Area

Review cables, clips, straps, anchors, and cover overlap. One side should not appear much tighter or shorter than the opposite area.

Record Early Changes

Note the pillow shape, water level, cover profile, and any movement. A short written record makes later weather-related changes easier to compare.

Inspect After Conditions Change

Winter inspections should follow weather events rather than relying only on a fixed monthly date. A single storm or thaw can change the cover profile within several hours.

Check After Rain and Wind

Review the setup after moving weather.

  • Look for new standing water
  • Check shifted cover overlap
  • Inspect pillow position
  • Review rope tension
  • Remove accessible debris

Wind and rainfall often move the main low area away from its original location.

Check After Snow and Thawing

Review changing surface loads.

  • Compare dry and wet snow
  • Inspect during rapid melting
  • Keep pump inlets open
  • Check for refrozen water
  • Watch one-sided buildup

Snow that becomes wet may place more load on the cover than its visible depth suggests.

Check During Stable Periods

Complete routine seasonal checks.

  • Compare the water level
  • Observe pillow firmness
  • Check fastening components
  • Review wall clearance
  • Inspect pump and hose condition

Slow changes can develop even when no major storm has occurred.

Remove the Pillow in the Correct Order

Spring opening begins with the material resting on top of the cover. Removing the cover before water and debris are managed may allow dirty surface material to enter the pool.

Remove Surface Water

Use an approved pump, drain, or siphon before loosening the cover. Keep the discharge hose directed away from the pool base and confirm the remaining cover is still safely secured.

Clear Remaining Debris

Remove leaves, twigs, dirt, and softened organic material using cover-safe tools from outside the pool. Wait for remaining ice to melt instead of breaking it with sharp equipment.

Clean and Store the Pillow

Untie and remove the pillow after the cover is ready to move. Wash both sides, dry completely, release the remaining air, and store with loose folds in a dry indoor location.

Ice Equalizer Pillow FAQs

When Should the Pillow Be Installed?

Install it after cleaning, water preparation, equipment shutdown, plumbing work, and final water-level adjustment, but before the winter cover is fully secured.

Why Should the Pillow Be Inflated to 70%?

About 70% inflation creates a rounded but flexible chamber. The remaining internal space helps reduce continuous pressure on seams and allows normal response to temperature changes.

Can the Pillow Replace Plumbing Winterization?

No. Pumps, filters, heaters, hoses, skimmers, and return lines must be prepared separately according to their own instructions.

Can I Change the Water Level After Covering?

It may require reopening or adjusting the cover and pillow. Set and record the required winter water level before installing the pillow.

How Soon Should I Recheck the Setup?

Complete the first inspection after approximately 24 hours. Check the pillow position, firmness, rope tension, cover overlap, water level, and surface buildup.

Does the Pillow Keep the Cover Dry?

No. It may reduce one deep central basin, but standing water can still form. Approved pumping and regular winter cover care remain necessary.

Is One Size Suitable for Every Pool?

No. Compare the usable water area, cover slack, pool shape, wall clearance, obstacles, and installation space before choosing a size.

Can I Use a High-Pressure Air Compressor?

A compatible low-pressure pump or blower provides better control. High-pressure equipment may inflate the chamber too quickly or beyond the intended firmness.

Can the Pillow Be Installed During Strong Wind?

Calm conditions are easier and safer for handling large pillows and covers. Strong wind may rotate the pillow or pull the cover out of position.

What Should Be Checked During Winter?

Inspect after rain, strong wind, snow, thawing, freezing rain, and periodically during stable weather. Watch water level, cover tension, pillow shape, and surface buildup.

When Should the Pillow Be Removed?

Remove it during spring opening after surface water and debris have been managed and the winter cover is ready to come off.

Is an Air Pump Included?

No. The package includes the pillow, securing rope, and instructions. A compatible low-pressure pump or blower must be prepared separately.

Follow the Closing Order from Start to Finish

A reliable seasonal closing depends on completing each task before the next one begins. The pillow should be one of the final components installed, not a shortcut around unfinished pool preparation.

Before the cover is secured:

  • Inspect the pool and winter equipment about 7 days ahead
  • Clean the water, walls, floor, and collection equipment
  • Test and prepare the water according to the product instructions
  • Drain or prepare pumps, filters, heaters, and hoses
  • Protect skimmer and return fittings
  • Set and record the required winter water level
  • Inspect the 0.5 mm PVC, seams, valve, and grommets
  • Confirm the selected pillow size
  • Inflate the chamber to about 70%
  • Guide the pillow near the usable center
  • Spread and fasten the cover in stages
  • Complete the first inspection after 24 hours
  • Recheck after major winter weather
  • Remove surface water and debris before spring opening
  • Clean and dry the pillow before indoor storage

EPN ice equalizer pillows are available in six flat sizes from 3 Γ— 3 ft to 4 Γ— 15 ft. Choose the option according to the pool layout, usable water area, cover slack, and installation space.

Get A Quick Quote

Send us a message if you have any questions or request a quote. We will be back to you ASAP!

EPN Pool Pillows

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN whale Splash Pad

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

Summer Splash Pad

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

Summer large Splash Pad

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN Dog Paddling Pool with Canopy

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN Splash Pad with Basketball Hoop

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN Soccer Splash Pad

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN punching bag

Buy on Amazon Now

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN Dog Pool with Sprinkler

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN Dog Pool

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN Dog Splash Pad

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN Splash Pad

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information:

EPN snow tube

Buy on Amazon

Fast 1–3 days delivery from local FBA warehouses. Choose your region to continue to Amazon.

After-sales Contact Information: